SCHS Header
Link to Homepage
Link to About Us page
Link to Staff & Board page
Link to Wallace Learning Center page
Link to Exhibits page
Link to Events Calendar page
Link to Archives page
Link to Online Store
Link to Membership page
Link to Volunteer page
Link to Contact Us page
Historical photo show 100 years ago header


100 Years Ago


Agriculture
Black History
Canal
Civil War
Downtown
Education
Entertainment
Events
Gold Rush
Immigration
Indians
Industry
Landmarks
Law and Order
Organizations
People
Pioneers
Politics
Sports
Transportation
War
Women

Making the Canal Locks

The most daunting task involved planning and building the canal to traverse the highest point between the Ohio River and Lake Erie at what is now the village of Lockington (lock shown below). This point, known as the Loramie Summit, is 512 feet above the Ohio River. In or near the village of Lockington alone, 6 locks were constructed to raise the level of the canal water 67 feet. Proceeding northward from the village, the canal covered 21 miles of flat terrain until the next lock in the village of New Bremen.

Each lock was engineered to precise specifications. They were 80 feet long and 14 feet wide. Huge limestone blocks, weighing up to 500 pounds, were cut and hauled into place. Massive gates of white oak were installed. According to Daniel Porter of the Ohio Historical Society, the locks were tied into the earth with long foundation stones. Most had wooden floors, which never rotted as long as they were covered by canal waters. Locks had hydraulics installed, so that after a canal boat was floated into the lock, and the gate closed, water was pumped in, raising the boat to the height necessary for it to pass out the other side of the lock and continue its journey. The typical lock on the canal had a lift of 10 feet, although Lock No. 1 at Lockington had a lift of 15 feet.

Many locks and other locations had mills.  These mills used water discharged by the locks to turn massive grinding wheels, which ground grain produced by local farmers.  Excessive water usage was an occasional problem.   The editor of "The Sidney Journal" reported on April 30, 1875, that "W.I. Jackson of Piqua has been along the Sidney Feeder...establishing water gauges...where the water is drawn from the canal for mills.  Hereafter, no water can be taken from the canal when by so doing navigation is in the least interfered with..." 

locking.jpg (42849 bytes)

The Lockington Locks in 1998.  Photo by Tom Homan

'Canal' segment written in December, 1998 by Rich Wallace

 

[ Back to Canal Index ]

Article Footer
SCHS footer Link to Home page Link to About Us Information Link to the Ross Center Information Link to our Events Calendar Information Link to our Archives Information Link to our Online Store / Products Information Link to our Membership Information Link to our Volunteering Information Link to our Contact Information Link to Staff & Board Information Link to our Current & Upcoming Exhibits Information Link to our Donation Information